Solar PV Guides

View all articles
backupCabinet de stocare industrială KSTAR cu invertor hibrid

Battery Backup for Industrial Halls: Why Motors Change the Calculation

A 15 kW motor can draw about 90 kW at start-up. That is why, in a hall with motors, battery backup is provided only for critical loads.

montaj fotovoltaicSolar panels installed on a residential tile roof

How We Work at Nectaria: From Your Electricity Bill to a Commissioned System

How we analyse consumption and the grid connection, choose the equipment, and prepare installation, commissioning and the prosumer documentation.

backupHinen inverter, switching equipment and battery in a real installation

Solar PV System Without a Battery: When It Makes Sense and When to Add Storage

Compare direct consumption, energy stored for the evening and backup. Hinen hybrid inverters allow a compatible battery to be added later.

dimensionare sistemSolar PV system installed on the tile roof of a house in Alba County

How Many kWp Do You Need? Sizing by Consumption, Grid Connection and Roof

Consumption, approved power and usable area determine the configuration. We explain kWp, kW and kWh, and how we choose the panels and the inverter for your home.